Depot and Workshops for the line 3 of the Guadalajara metro (Mexico)

Metro de Guadalajara (México)
1 3
Depot and Workshops for the line 3 of the Guadalajara metro (Mexico)
Client: Ministry of Communications and Transportation (SCT)
Country: Mexico

As part of the works developed in the Guadalajara (Mexico) metro line 3 project, at SENER we carried out the design of train depots and workshops, which are located in a plot measuring around 13 Ha in Tonalá.

The set of buildings that allows for the operation and maintenance of  the Line 3 includes: Workshop, Stabling Hall, Warehouse, Maintenance Vehicles Workshop, Substation, Administration, Waste Management, Signalling, Security Gatehouse and Control Center, with .

The project scope includes:

  • architectural and functional design,
Read more

As part of the works developed in the Guadalajara (Mexico) metro line 3 project, at SENER we carried out the design of train depots and workshops, which are located in a plot measuring around 13 Ha in Tonalá.

The set of buildings that allows for the operation and maintenance of  the Line 3 includes: Workshop, Stabling Hall, Warehouse, Maintenance Vehicles Workshop, Substation, Administration, Waste Management, Signalling, Security Gatehouse and Control Center, with .

The project scope includes:

  • architectural and functional design,
  • detailed design for all disciplines,
  • site supervision,
  • implementation, coordination and management of BIM,
  • implementation of document management and change control and management.
Gross floor area of 26.728 m2
10 buildings for the operation and maintenance
A project fully developed by SENER
Read less