High Gain Antenna Gimbal (HGAG) for the rover Perseverance of the Mars 2020 mission
Sener is in charge of the design of the new monorail network in Cairo (Egypt). The project, which involves the development and construction of 96 kilometers of elevated track, 35 stations and two depots, will become the longest driverless monorail network in the world to date and the second longest overall.
In association with Shaker Consultancy Group, Sener is responsible for the design of the special bridges, the architecture and the structural and envelope design of the stations and depots, in addition to all systems assurance.
The project covers two lines. The “New Capital” will connect the new urban areas of New Cairo and the Administrative Capital and will have 22 stations and a 54-kilometer route. The “6th of October” line will be 42 kilometers long and have 13 stations, to provide service from the west of the Nile to Giza.
INNOVA has participated in the project, specifically in the development of the layout and the girder-rail, while Orascom, Arab Contractors and Alstom carry out the works as main contractors for the Egyptian National Tunnel Authority (NAT).
In the design of the Cairo monorail, Sener is responsible for the following works required by the project: