Sener is developing the construction engineering of the pumped-storage facility in Salto de Chira, on the island of Gran Canaria, designed and financed by Red Eléctrica.
This 200 MW hydroelectric storage facility (equivalent to 36% of the island’s peak demand) will connect the existing reservoirs of Chira and Soria, in the south of the island.
The facility will act as a large natural battery, providing a storage capacity of 3.5 GWh, enough to power the island for almost 7 hours.
The pumped storage facility in Salto de Chira will be used to store surplus energy from renewable sources, such as wind and solar.
This facility will serve to reinforce the electricity supply on the island and promote the integration of renewables into the island’s electric grid.
For this project, Sener is doing the construction design work of the different elements that make up the pumped storage facility:
“Sener is strongly committed to the energy transition towards a more sustainable model based on technology and innovation”.
“Our contribution to this project is an example of our experience in the field of renewable power integration and the optimisation of transport networks using various storage technologies. We are pleased to contribute to the development of this innovative design by Red Eléctrica for the Salto de Chira facility, which incorporates the latest technological advances and cutting-edge engineering to maximise its flexibility and performance”.